HHNE Photo Gallery

Browsing the April 14-May 4, 2010 album

Additional site work, clearing the path to Abrams Boulevard, underslab plumbing, steel frame assembly, concrete pouring, and water connection installation: the building takes form!
HHSNE 416 237
HHSNE 416 238
HHSNE 416 239
HHSNE 416 240
HHSNE 416 241
HHSNE 416 242
HHSNE 416 243
HHSNE 416 244
HHSNE 416 245
HHSNE 416 246
HHSNE 416 247
HHSNE 416 248
HHSNE 416 249
HHSNE 416 250
HHSNE 416 251
Powered by zenphoto